UPPER COMPLETION

The Upper Completion is the connection from the lower completion to the well head at the surface and would include a way to attach the tubing to the lower packer to allow flow through the tubing while isolating the casing from the pressure and fluids flowing from the produced reservoir

MALEGA ENERGY SERVICE SARL is a team of qualified and experienced Engineers from 10 to 30 years of experience in Oil and gas industry that are capable to address and provide solutions for all your queries related to Drilling and completion engineering; reservoir damage and optimization assessment, completion and work over, and for field development studies and abandonment.